R4.5M+
Average cost of downtime per incident for mid-sized SA businesses
93%
Of businesses without DR close within 1 year of major data loss
99%+
Cove Data Protection automated recovery success rate
Most disaster recovery plans fail for a simple reason: they exist as documents, not as tested procedures. A plan that has never been rehearsed is a hope, not a strategy.
This checklist turns hope into action. Use it as a working template to build, test, and maintain a disaster recovery (DR) plan that protects your business when it matters most.
Step 1: Define Your Recovery Objectives
Before selecting tools or writing procedures, establish what your business actually needs.
RPO — Recovery Point Objective is the maximum amount of data you can afford to lose. If your RPO is 4 hours, your backups must run at least every 4 hours. Anything older than that is gone.
RTO — Recovery Time Objective is the maximum time your business can be offline. If your RTO is 2 hours, your recovery process must restore critical systems within that window.
- Define RPO for each critical system (email, ERP, file shares, databases)
- Define RTO for each critical system
- Get sign-off from business leadership — these are business decisions, not IT decisions
- Document acceptable data loss and downtime in writing
Tip: Start with the question "How much would one hour of downtime cost us?" The answer sets your RTO budget.
Step 2: Map Your Critical Systems
Not everything needs the same level of protection. Rank your systems by business impact.
Tier 1 — Mission Critical (RTO: under 1 hour)
Systems that stop revenue when they go down.
- Email and communication platforms (Microsoft 365, Teams)
- ERP / accounting systems
- Customer-facing applications and websites
- Core databases
Tier 2 — Business Important (RTO: 4–8 hours)
Systems that cause disruption but not immediate revenue loss.
- File servers and shared drives
- Internal collaboration tools
- HR and payroll systems
Tier 3 — Standard (RTO: 24–48 hours)
Systems that can wait.
-
Development and test environments
-
Archive and historical data
-
Non-critical internal tools
-
Complete a full asset inventory of servers, workstations, and cloud services
-
Assign each asset to a tier
-
Document dependencies — which systems rely on which
Step 3: Establish Your Backup Strategy
Your backup strategy must match your recovery objectives. If your RPO is 1 hour but your backups run daily, the plan is already broken.
- Confirm backup frequency meets RPO requirements for each tier
- Use immutable backups — backups that ransomware cannot modify or delete
- Store backups off-site or direct-to-cloud, outside your production network
- Encrypt all backups with AES-256 at rest and in transit
- Maintain a minimum of 30 days of recovery points
- Back up Microsoft 365 data separately (Exchange, SharePoint, OneDrive, Teams)
- Verify bare-metal recovery capability for physical servers
- Confirm virtual machine backup coverage (Hyper-V, VMware, Azure)
Why Cove Data Protection: Cove's direct-to-cloud architecture eliminates local backup appliances. Data goes straight to one of 30 global data centres — including South African storage locations — encrypted with AES-256. Backups are immutable by design. Cove's TrueDelta technology produces incrementals that are 60x smaller than traditional file-level backups, making cloud backup practical even on South African bandwidth.
Step 4: Build Your Communication Plan
When disaster strikes, people panic. A written communication plan removes the guesswork.
- Designate a DR coordinator with authority to trigger the plan
- Create a contact list with mobile numbers for all key personnel
- Define who communicates with staff, clients, suppliers, and media
- Prepare template communications for common scenarios (ransomware, power failure, hardware failure)
- Store the communication plan offline — printed copies and in mobile phones
- Include your IT provider's emergency contact details
Key Contacts Template
| Role | Name | Mobile | |
|---|---|---|---|
| DR Coordinator | |||
| IT Lead | |||
| CEO / MD | |||
| IT Service Provider | |||
| Insurance Provider | |||
| Legal Counsel |
Step 5: Document Recovery Procedures
Step-by-step instructions that any competent IT professional can follow — not just the person who set up the system.
- Write recovery runbooks for each Tier 1 system
- Include login credentials in a secure, offline location (not in the DR document itself)
- Document the recovery order — which systems come up first
- Include network configuration details (IP addresses, DNS, firewall rules)
- Document cloud service recovery procedures separately
- Create a "bare minimum" recovery plan — the fastest path to basic operations
Step 6: Test Your Plan
This is where most organisations fail. A plan that has never been tested is not a plan.
- Schedule quarterly DR tests (minimum)
- Run a full failover test annually
- Test individual system restores monthly
- Record recovery times and compare against your RTO targets
- Document what failed during each test and fix it
- Verify backup integrity — can you actually restore from your backups?
Cove automates this. Cove runs automated recovery testing on 14-day and 30-day cycles. Every backup is tested for recoverability and you receive a report confirming success or failure. No manual effort required, and a 99%+ success rate across the platform.
- Review and update the DR plan after every test
- Review and update after any infrastructure change
- Review and update after any personnel change
Step 7: Address South African-Specific Risks
Operating in South Africa means planning for risks that other regions do not face.
- Load shedding contingency — UPS and generator runtime calculations
- Bandwidth constraints — ensure backup solutions work on limited connectivity
- POPIA compliance — confirm backup and recovery procedures meet data protection requirements
- Physical security — include theft and vandalism in your risk register
- Confirm your backup provider has South African data residency options
Your DR Plan Scorecard
Count your checked items above. Here is where you stand:
35+ items checked:
Strong foundation. Test regularly and keep it current.
25–34 items checked:
Good start. Prioritise the gaps before your next quarterly review.
Under 25 items checked:
Significant risk. Begin with Steps 1 and 2 immediately.
Build a DR Plan That Works
A disaster recovery plan is only as good as its last test. OAS builds and tests DR plans that actually work — backed by Cove Data Protection's automated recovery testing and the "Recover" pillar of our Protect, Detect, Recover methodology. With 40+ years of enterprise IT experience in South Africa, we have a proven track record of keeping businesses running when disaster strikes.